The Canada Energy Regulator has made a lower pressure ceiling the approved limit for Trans-Northern Pipelines Inc.’s Montreal-to-Ste Rose pipeline, allowing the line to leave a safety order without authorizing a return to its former operating pressure.
In Orders AO-003-OC-3 and AO-014-SO-T217-03-2010, File 4668651, the Commission of the Canada Energy Regulator reduced the approved maximum to 5,793 kilopascals from 8,275 kilopascals. The orders are dated February 4, 2026; the accompanying decision letter is dated February 5.
Changed operating needs
Trans-Northern applied on July 16, 2025 to change the pressure authorized by Certificate OC-3 and remove the nominal 10-inch pipeline from Schedule B of a broader safety order.
The line had operated under a safety-related pressure restriction since September 20, 2016. At the time of the application, that restriction already limited it to 5,793 kilopascals. The requested change therefore aligned the underlying approval with the lower pressure rather than increasing the pipeline’s permitted operating pressure.
The company said changed throughput requirements meant it would continue operating at or below that level. Instead of seeking permission to resume operating at the original higher pressure under a condition of the safety order, it asked to lower the certificate’s ceiling.
Two distinct changes to the approvals
The Commission explained that review of an existing order under section 69 of the Canadian Energy Regulator Act is discretionary, not automatic. Its two-stage process first asks whether an applicant has raised doubt about the existing decision, including through changed circumstances or new facts. The application must also identify resulting or anticipated prejudice or damage. The Commission then decides whether to confirm, amend or overturn the decision.
Although Trans-Northern invoked section 69 for both requests, the Commission identified section 190 as the authority for changing the certificate.
It accepted the changed throughput requirements as grounds for the lower approved ceiling and found the company had demonstrated that operating at 5,793 kilopascals was safe. The evidence included an annual engineering assessment filed on September 26, 2024, a compliance-review report updating the pipeline’s fitness for service, and responses to information requests.
The Commission also identified a practical problem with leaving the certificate unchanged. Trans-Northern had shown the line was safe at the lower pressure, while the safety order reflected that it was not safe at the higher approved pressure. Leaving that mismatch in place could expose the pipeline to additional safety orders.
Relief limited to this pipeline
Removal from the safety order rested on two developments together: the newly reduced approved ceiling and demonstrated compliance with conditions 4.a through 4.e, which applied across Trans-Northern’s system. The Commission found the concerns that led to this pipeline’s inclusion had been resolved. Continuing to require annual engineering assessments under the safety order would therefore prejudice the company.
Order AO-003-OC-3 changed the certificate’s pressure limit. Order AO-014-SO-T217-03-2010 deleted the Montreal-to-Ste Rose pipeline from Schedule B. Other entries remained in the schedule: the decision did not cancel the broader safety order or authorize higher-pressure operation across the company’s network.